Roofline is quoted by the metre and by the access, not by the size of the house. Once you know that, wildly different quotes start to make sense.
Call 07476 888638 for a free, no-obligation quote. Available Mon–Sun, 9am–6pm.
A full roofline replacement means fascias, soffits, bargeboards and guttering off and renewed in one visit. It is priced from the metres of board and gutter running round the property, the access needed to reach it, and what the timber behind turns out to be. A long single-storey bungalow can cost more than a tall narrow terrace for exactly that reason.
The reason it is usually cheaper as one job is mechanical rather than commercial. The gutter has to come off to change the fascia, and the soffit has to come off to see the rafter feet. Splitting the work into separate visits means paying for the same access two or three times over.
If a quote is a single number with no breakdown, you cannot compare it with anything. Ask for these items in writing before you commit.
Say you replace the fascias now and the guttering in two years. The gutter comes off during the first job, gets refitted, then comes off again for the second. You pay twice for access, twice for setting up, and the new gutter never matches the weathering on the boards fitted two winters earlier.
The same applies to doing the front now and the back later. It is a legitimate way to spread cost, and we will quote it that way if you ask, but the total is higher than doing the whole roofline in a single visit.
Three things move a roofline price far more than anything else: whether the job is capping or full replacement, whether it needs a scaffold or can be done from a tower, and how much timber turns out to be rotten once the boards are off. A good quote states the first two clearly and gives you a rate for the third rather than leaving it open.
Anything else, from board colour to gutter profile, moves the number by comparatively little. If two quotes are hundreds apart, the difference is almost always in those three lines.
Nobody can see the rafter feet from the pavement. We inspect from an access platform before quoting so the price is based on what is actually there, and if worse rot appears once the boards are off, we stop, photograph it and show you before any extra work happens.
Tell us about your roofing job and we'll get back to you as soon as possible.
Yes, in almost every case. The access is the largest fixed cost and doing the job once means paying for it once.
It should be visible either way. We include access in the written price so there is no separate bill afterwards, but you should be able to see what it costs.
On roofline work labour and access usually outweigh the boards. That is why a cheap quote most often means a shortcut in method, not cheaper plastic.
Timber repairs are priced when we see them, and we show you the photographs first. Nothing is added without you agreeing to it.
Two to three days on a typical semi or terrace once access is up, longer on three storeys or where a lot of timber needs cutting out.
Covering Swansea, Neath Port Talbot and West Glamorgan.