What Should a Roofing Contractor's Quote Include?

A checklist you can hold against any quote before you agree to anything or pay a penny.

Call 07476 888638 for a free, no-obligation quote. Available Mon–Sun, 9am–6pm.

A roofing contractor's quote should say in writing exactly what work will be done, which materials will be used, how waste is dealt with, what access is included, the total price and whether VAT is included, and how extra work found during the job will be agreed.

A quote is a promise about work that has not happened yet. The more of it that is written down, the fewer arguments there are later, and the easier it is to compare two roofers fairly.

Run any quote you have been given through the checks below. Anything you cannot find on the page, ask for in writing before you accept.

The checklist

A good roofing quote answers all of these without you having to ask.

  • Exactly which areas of the roof are included, and which are not
  • The covering by name, not just tile or slate
  • The underlay type, and battens new or reused
  • Ridge and verge method, dry fixed or bedded
  • Flashing material and lead code where relevant
  • Guttering, fascias or soffits, included or excluded, stated either way
  • Scaffold or access arrangement and who pays for the hire period
  • Waste removal and how the site will be left
  • What happens if rotten timber is found, and at what rate
  • Workmanship guarantee length and what voids it
  • Payment schedule, deposit if any and what it covers
  • Start date or lead time and expected duration

Comparing two contractors' quotes fairly

Put the quotes side by side and check they describe the same job. One may include new felt and battens and the other only tiles; one may include scaffolding and the other leave it out. The cheaper quote is often the one that has left something out.

If a line is vague, ask the contractor to write it out in full. A roofer who is confident in the price will not mind.

Wording worth asking for

Two short sentences prevent most disputes. First: any additional work will be shown to you, priced and agreed in writing before it is carried out. Second: the final invoice will not exceed the quoted figure other than for that agreed additional work.

Any roofer working properly will add both without hesitation.

Deposits and payment

On smaller repairs there is usually no reason for a deposit at all. On larger jobs a deposit that matches a specific material order is reasonable, and it should be described that way on the quote rather than as a percentage plucked from the air.

Never pay in full before the work is complete, and keep the paperwork. If you ever claim on insurance or sell the house, the quote and the guarantee are the evidence the work was done properly.

How we put ours together

We inspect for free, including the loft where we can get into it, then write the quote against the checklist above. If you have a question about a line, ring 07476 888638 any day between 9am and 6pm and we will talk it through.

Want a professional to handle it?

Get Your Free, Personalised Quote

Tell us about your roofing job and we'll get back to you as soon as possible.

No spam, no obligation. We'll get back to you as soon as possible.

Free Inspections
Fast Response
Reliable Workmanship
West Glamorgan Coverage

Questions

Should a roofing quote include scaffolding?

It should say clearly whether access is included, and what kind, so you can compare quotes fairly.

What if two quotes are very different?

Check they describe the same work and materials. The gap is usually in what one of them has left out.

Is a verbal quote worth anything?

Very little once memories differ. Ask for it in writing even for small repairs, if only so you both agree what was included.

Should a quote include VAT?

It should be clear either way. A figure that turns out to be plus VAT at the end is the most common unpleasant surprise in this trade.

How long is a written roofing quote good for?

Around thirty days is normal. Material prices move, so a quote from last spring may need revisiting rather than simply honouring.

What if extra work is found halfway through?

It should stop, be shown to you and be priced before continuing. That is exactly what the additional work wording above is for.

Do you charge for quoting?

No. Inspection, advice and the written quote are free, whether you go ahead with us or not.

Related services