A roofing contractor's quote should say in writing exactly what work will be done, which materials will be used, how waste is dealt with, what access is included, the total price and whether VAT is included, and how extra work found during the job will be agreed.
A quote is a promise about work that has not happened yet. The more of it that is written down, the fewer arguments there are later, and the easier it is to compare two roofers fairly.
Run any quote you have been given through the checks below. Anything you cannot find on the page, ask for in writing before you accept.
A good roofing quote answers all of these without you having to ask.
Put the quotes side by side and check they describe the same job. One may include new felt and battens and the other only tiles; one may include scaffolding and the other leave it out. The cheaper quote is often the one that has left something out.
If a line is vague, ask the contractor to write it out in full. A roofer who is confident in the price will not mind.
Two short sentences prevent most disputes. First: any additional work will be shown to you, priced and agreed in writing before it is carried out. Second: the final invoice will not exceed the quoted figure other than for that agreed additional work.
Any roofer working properly will add both without hesitation.
On smaller repairs there is usually no reason for a deposit at all. On larger jobs a deposit that matches a specific material order is reasonable, and it should be described that way on the quote rather than as a percentage plucked from the air.
Never pay in full before the work is complete, and keep the paperwork. If you ever claim on insurance or sell the house, the quote and the guarantee are the evidence the work was done properly.
We inspect for free, including the loft where we can get into it, then write the quote against the checklist above. If you have a question about a line, ring 07476 888638 any day between 9am and 6pm and we will talk it through.
Tell us about your roofing job and we'll get back to you as soon as possible.
It should say clearly whether access is included, and what kind, so you can compare quotes fairly.
Check they describe the same work and materials. The gap is usually in what one of them has left out.
Very little once memories differ. Ask for it in writing even for small repairs, if only so you both agree what was included.
It should be clear either way. A figure that turns out to be plus VAT at the end is the most common unpleasant surprise in this trade.
Around thirty days is normal. Material prices move, so a quote from last spring may need revisiting rather than simply honouring.
It should stop, be shown to you and be priced before continuing. That is exactly what the additional work wording above is for.
No. Inspection, advice and the written quote are free, whether you go ahead with us or not.