Honest budget bands by property size, plus the parts of the job most quotes forget to spell out.
Call 07476 888638 for a free, no-obligation quote. Available Mon–Sun, 9am–6pm.
Most people asking this have already been told a number by a neighbour or a search result and want to know whether it applies to their house. It usually does not. Replacing a roof is priced from four things: how many square metres of covering there are, how steep it is, what goes on top, and what the roofer finds when the old covering comes off.
Below are the bands we see in practice across West Glamorgan, written so you can place your own property in one of them and know what should and should not be inside the price.
These are whole job figures including strip out, disposal, new battens where needed, breathable membrane, the covering, ridge and verge work, scaffolding and clean up. They are indicative, not a quote.
A roof replacement is not just the tiles. If any of the following is missing from a written quote, ask why before you compare it against another.
Pitch comes first. A steep roof is slower and needs more edge protection. Shape comes second: every hip, valley and dormer is hand cut detail work rather than straight courses.
Then comes access. A roof over a conservatory, a rear elevation reached through a neighbour's garden, or a house on a narrow lane all add scaffold cost. Fourth is timber. Perished battens are normal and priced in, sagging or rotten rafter feet are not, and a good roofer will tell you the rate for that work before starting rather than after.
Fifth is the covering itself: natural slate costs more to buy and more to fix. Sixth is what you choose to do at the same time. Renewing guttering, fascias and soffits while the scaffold is standing costs far less than paying for access twice.
Replacement is not automatically the expensive option. If the underlay has perished and slipped tiles are appearing in a new place every winter, you are paying for access repeatedly and still living with the leaks. Two or three call outs a year for five years buys a large slice of a new roof.
If the covering is sound and the failures are all in one area, repair is the right call and we will say so at the inspection.
Tell us about your roofing job and we'll get back to you as soon as possible.
A straightforward terrace or semi is usually four to seven working days on the roof once the scaffold is up. Hips, dormers and slate work take longer because far more of the roof is cut by hand.
No. The work happens outside and above you. Expect noise during the strip out and dust in the loft, so it is worth covering anything stored up there.
For a full replacement, yes. Anyone offering to re roof a house off ladders is cutting a corner that affects both safety and the quality of the edge detailing.
Yes, and on a semi or a terrace where only one slope has failed it can be sensible. We will point out where the join will sit and how it will be weathered so you know what you are getting.
We measure and inspect the roof free of charge, including a look in the loft, then send a written itemised price. Call 07476 888638 any day between 9am and 6pm.
Covering Swansea, Neath Port Talbot and West Glamorgan.