What Happens During a Re-Roof

From scaffolding going up to the final check, here is the order of work and what to expect at each stage.

Call 07476 888638 for a free, no-obligation quote. Available Mon–Sun, 9am–6pm.

Knowing the sequence makes a re-roof far less stressful, and it helps you see whether the work is progressing properly.

The stages below apply to a typical pitched domestic re-roof. Your quote should reflect this sequence in its own wording.

Stages 1 to 3: access, strip and inspection

Scaffolding is erected first, with protection where needed. The existing covering, battens and felt are then stripped and removed from site. With the roof open, the rafters and wall plates are inspected — this is the point at which any hidden timber decay becomes visible, and it should be discussed with you before the work continues.

Stages 4 to 6: membrane, battens and covering

A breathable membrane is laid and lapped correctly, then new treated battens are fixed at the gauge suited to the covering. The new tiles or slates are laid from the eaves up, with the correct headlap and fixing specification for the exposure.

  • Breathable membrane, correctly lapped and supported
  • New treated battens at the correct gauge
  • Eaves, verge and valley details formed properly
  • Fixings specified for the exposure, not just the middle of the roof

Stages 7 to 9: lead work, ridge and sign-off

Lead flashings are formed and dressed at chimneys, abutments and valleys. Ridge and hip tiles are bedded or dry-fixed. Finally the site is cleared, the gutters are cleaned out, and the finished roof is walked through with you before the scaffolding comes down — which is the right moment to raise anything, while access is still in place.

Want a professional to handle it?

Get Your Free, Personalised Quote

Tell us about your roofing job and we'll get back to you as soon as possible.

No spam, no obligation. We'll get back to you as soon as possible.

Free Inspections
Fast Response
Reliable Workmanship
West Glamorgan Coverage

Questions

Can I stay in the house during a re-roof?

Yes, in almost all cases. There is noise during working hours and scaffolding around the property, but the house remains habitable.

What happens if it rains mid-job?

Work is planned in sections so the roof is never left open beyond what can be covered. Temporary sheeting protects any open area overnight and in bad weather.

What if rotten timber is found?

You should be shown it and given a price before it is replaced. That is why the quote should state a rate for timber replacement up front.