Split a re-roofing quote into its component costs and it becomes obvious which quotes are complete and which have left something out.
Call 07476 888638 for a free, no-obligation quote. Available Mon–Sun, 9am–6pm.
A re-roofing quote arrives as one number, and that single number makes comparison almost impossible. Break it into its parts and the picture changes: you can see instantly whether one quote has priced scaffold and another has not, or whether the cheap one is using a cheaper membrane.
This guide breaks a typical three-bedroom semi re-roof into its cost components, with the approximate share each one takes. Use it as a checklist against any quote you receive.
For a standard three-bedroom semi with a straightforward pitched roof, costs usually distribute roughly as follows. Complex roofs with dormers, valleys and multiple chimneys shift more weight into labour and lead.
Scaffolding is the classic omission. If it is not on the quote, ask whether it is included or whether you will be invoiced separately by the scaffold firm. A four-week hire on a semi is not a rounding error.
Timber replacement is the second. Nobody knows the state of the rafters until the covering is off, so a good quote states a rate — per metre of batten, per rafter repair — agreed in advance.
Roofline is the third. Fascias, soffits and guttering are far cheaper to renew while the scaffold is standing. If they are twenty years old, doing them later means paying for scaffold twice.
Membrane is a small share of the cost and a large share of the performance. A quality breathable underlay costs a few hundred pounds more than the cheapest option and manages condensation properly for the life of the roof.
Lead is the other place not to economise. Code 4 and 5 flashings correctly chased in will outlive the covering; mortar fillets will not see out five winters.
Dry ridge and dry verge systems add cost up front and remove the single most common future repair. On exposed roofs they pay for themselves.
Covering choice is the biggest genuine lever. A quality concrete interlocking tile does the same job as natural slate for a fraction of the material cost, and on a post-war house it is often the visually appropriate choice anyway.
Timing helps too. Winter slots are usually easier to book, and combining roof, roofline and chimney work into one scaffold visit saves several hundred pounds against doing them separately.
Tell us about your roofing job and we'll get back to you as soon as possible.
A typical semi takes five to ten working days including scaffold up and down, weather permitting. Slate roofs and complex roofs with dormers take longer.
A materials deposit on a large job is normal. It should be documented, proportionate to the materials ordered, and never the majority of the contract value up front.
It rarely adds its full cost in valuation terms, but it removes a major deduction and a common reason for a buyer's survey to hold up a sale.
Standard-rate VAT applies to most domestic roofing work. Some conversions and certain listed-building works have different treatment; we state VAT clearly on every quote.
Covering Swansea, Neath Port Talbot and West Glamorgan.