A loft conversion turns a cold, ventilated roof space into a heated room. That changes what the roof has to do.
Call 07476 888638 for a free, no-obligation quote. Available Mon–Sun, 9am–6pm.
The most expensive mistake in a loft conversion is finishing the room and then discovering the covering above it needs replacing. Once plasterboard, insulation and decoration are in, re-roofing becomes far more disruptive than it would have been beforehand.
These are the roof decisions worth settling before the conversion starts.
If the roof covering is near the end of its life, do it before or as part of the conversion. Scaffolding is needed either way, and combining the works avoids paying for access twice and avoids disturbing new finishes later.
Converting to a warm roof at rafter level removes the ventilated loft that previously handled moisture. The insulation build-up and any ventilation path must be designed as one thing. This is where poorly planned conversions produce condensation and damp within a year or two.
Dormer cheeks and roofs are small, detail-heavy areas that leak when rushed. Roof windows need the correct flashing kit for the covering profile. Both are best carried out by the roofer as part of a coordinated sequence rather than squeezed in between other trades.
Tell us about your roofing job and we'll get back to you as soon as possible.
Whichever avoids paying twice for access and avoids disturbing finished work. In most cases that means before or as part of the same programme.
Not if the insulation and ventilation are designed together. Problems arise when insulation is added without a considered ventilation path.
Yes — we regularly carry out the roofing element and coordinate the sequence with the main contractor.
Covering Swansea, Neath Port Talbot and West Glamorgan.