Lead is priced by weight, skill and access. Here is what each type of flashing typically costs and what a proper specification looks like.
Call 07476 888638 for a free, no-obligation quote. Available Mon–Sun, 9am–6pm.
Lead is the most reliable waterproofing detail on a pitched roof and the most commonly botched. Where a roof meets a chimney, a wall, a dormer cheek or a valley, lead is what keeps the water out — and when it has been replaced with mortar fillets, flashband or mastic, that is where the leak comes from.
Because lead is sold by weight and installed by hand, prices vary more than most roofing work. This guide explains the ranges and, more usefully, how to tell whether a quote specifies the work properly.
The ranges below assume Code 4 or Code 5 milled lead to BS EN 12588, correctly dressed, chased into the joint and pointed. Access and chimney height are the main variables.
Lead is graded by code, which is a measure of thickness. The higher the code, the thicker and more durable — and the more expensive — the sheet.
A proper flashing is chased into a mortar joint, wedged and pointed, with individual pieces no longer than about 1.5 metres so the lead can expand and contract without splitting. Long unbroken runs crack; that is physics, not bad luck.
Common shortcuts to watch for: lead simply mastic'd to the face of the brickwork; a sand-and-cement fillet in place of a flashing; flashband tape over the joint; or one continuous three-metre length of lead with no expansion joints.
Lead does not usually fail from age — properly installed flashings last fifty years or more. It fails from movement, from being installed in over-long lengths, from theft, and from being disturbed by other trades such as satellite installers and pointing contractors.
Look for splits across the width of the sheet, lifted edges where the wedges have gone, white powdery staining on the lead surface, or mortar fillets that have cracked away. Any of these are a call-out, not an emergency, but they will become one during a wet winter.
Tell us about your roofing job and we'll get back to you as soon as possible.
Yes. Milled lead sheet remains the standard specification for roof abutments and chimneys in the UK and is fully compliant for domestic roofing work.
Only as a temporary emergency measure. Self-adhesive tapes lose adhesion in a few seasons of UK weather and trap water behind them once they do.
Lead carbonate, caused by rain running over unprotected new lead. It is prevented by applying patination oil at installation. We apply it as standard.
Chimney work usually does, for safety and to work properly at height. We include the scaffold cost in the quote rather than adding it later.
Covering Swansea, Neath Port Talbot and West Glamorgan.