Every junction in a roof needs a detail. On most British roofs, that detail is lead.
Call 07476 888638 for a free, no-obligation quote. Available Mon–Sun, 9am–6pm.
Lead is used where the roof covering meets something else — a chimney, a wall, a valley, a dormer cheek. It is durable, it can be dressed to complex shapes, and properly installed it lasts for decades.
When lead work fails, it is usually because it was the wrong thickness, was fitted in lengths that are too long, or was never lead at all.
Lead is graded by code, which corresponds to thickness — the higher the number, the thicker the sheet. Code 4 is common for soakers and simpler flashings; Code 5 is used where more durability or a larger sheet size is needed, such as back gutters and valleys. Using too thin a code in an exposed position leads to splitting.
Lead expands and contracts noticeably with temperature. If a run is fitted in one long piece with no allowance for that movement, it fatigues and cracks — usually along a straight line partway up the sheet. Correct practice keeps individual pieces to sensible lengths with proper laps.
A mortar fillet along an abutment is rigid where the junction needs to move, so it cracks. Self-adhesive flashing tapes have a place as a temporary measure but are not a permanent replacement for dressed lead on an exposed abutment.
Tell us about your roofing job and we'll get back to you as soon as possible.
Correctly specified and installed lead is a long-life detail — it is generally the mortar joints around it and the surrounding covering that need attention first.
Small splits can sometimes be lead-welded, but where the failure is due to over-long sheets the piece needs reforming properly or it will split again.
It has been in some areas. Where that is a risk, alternatives and security measures can be discussed at survey.
Covering Swansea, Neath Port Talbot and West Glamorgan.