On a commercial building, the roof is rarely the constraint. Keeping the business trading underneath it is.
Call 07476 888638 for a free, no-obligation quote. Available Mon–Sun, 9am–6pm.
Commercial roofs are usually larger, flatter and busier with plant, outlets and rooflights than domestic roofs. The technical work is well understood; the planning around occupancy, access and downtime is what needs the most thought.
Here is what to consider before commissioning work on a commercial or industrial roof.
On a large roof area, a condition survey identifying which sections are failing allows work to be phased against a budget rather than done all at once. It also distinguishes genuine covering failure from blocked outlets and failed penetrations, which are far cheaper to resolve.
Noise, access equipment and hot works all need planning against trading hours. Out-of-hours or phased working keeps the business running, and internal protection may be needed where work takes place above a live space.
Blocked or undersized outlets, failed laps on single-ply and box-profile systems, corroded fixings, degraded rooflights and poorly sealed penetrations around plant account for a large share of commercial roof leaks. Many can be resolved as targeted repairs rather than a full recover.
Tell us about your roofing job and we'll get back to you as soon as possible.
Yes, and a condition survey is what makes that possible — it prioritises sections so the most urgent work is done first.
Where the work and safe access allow, yes. It is agreed at planning stage rather than assumed.
Yes — a photographed report with prioritised recommendations, suitable for budgeting and for facilities records.