Taking a redundant stack down looks like the cheap option. Sometimes it is; often the consequences cost more than the repair would have.
Call 07476 888638 for a free, no-obligation quote. Available Mon–Sun, 9am–6pm.
Plenty of houses in Swansea, Neath and the valleys carry chimneys that have not seen a fire in forty years. When the pointing fails and the flashings leak, the obvious question is whether it is worth spending money on a structure that does nothing.
It is a fair question, and the answer is genuinely case by case. Here are the factors that actually decide it.
Removal to below the roof line and tiling over is comparable in cost to a thorough repair. Full removal down through the house is considerably more, because it involves internal works, structural support and making good.
Resale is the strongest argument. Buyers and estate agents read a removed chimney on a period property as a loss of character, and a house with the flue intact keeps the option of reinstating a stove — which many buyers actively want.
Ventilation is the second. Old flues ventilate the rooms they serve and often the roof space too. Removing them can shift a house from breathing to sealed, particularly where windows have been replaced with double glazing.
And in a terrace, the stack is usually shared. Removing your half of a party stack destabilises your neighbour's half and will require their agreement and a party wall procedure.
Where the stack is genuinely redundant, structurally poor, and on a property where appearance is not a concern, removal ends an ongoing maintenance liability permanently.
It also removes the most common leak point on the roof. If the stack has caused repeated damp and the flashings, flaunching and pointing all need doing, removal may be the cheaper whole-life decision.
Removing at re-roof time is the efficient moment, because the scaffold is up and the covering is off anyway.
Taking the stack down to just below the roof line and roofing over is the usual approach. The remaining flue must be capped and ventilated, not sealed, or the redundant flue below will hold moisture.
The roof over the opening needs proper structural support — new rafters and battens tied into the existing structure — not just tiles laid over a patched hole. Done well it is invisible; done badly it shows as a dip in the roof line within a few years.
If breasts are being removed internally, that is structural work requiring building regulations approval and, in most cases, calculations for the gallows brackets or steel supporting the masonry above.
There is a third path people often miss: reduce the stack. Taking a tall stack down by a few courses to just above the ridge line, then re-flaunching and re-flashing, reduces exposure and cost while keeping the chimney.
This suits stacks that were built high for a coal fire's draw and are now unnecessarily exposed. Check first whether any working appliance still needs the height for its draught.
Tell us about your roofing job and we'll get back to you as soon as possible.
On a period property it can, particularly where neighbouring houses keep theirs. On a post-war house with no fireplaces, it usually makes no difference.
External removal is often permitted development on an unlisted house, but internal breast removal is structural and needs building regulations approval. Listed buildings need consent for either.
Not unilaterally. A shared stack on a party wall requires agreement with your neighbour and normally a party wall notice.
Nothing internally — the breast and fireplace remain. The flue is capped and ventilated at the new top. Reinstating a working fire later would require rebuilding.